Connecting to shared world…
Tracking servos losing lock
Average bursts per second per asteroid and fragments per burst. Timing and amounts vary randomly. Either at 0 stops new shedding. Cosmetic debris affects only this browser.
Unpowered preview ends at the time limit, either surface, or an approximate loop. Pe/Ap show approximate heights above the initially strongest gravity source; escaping paths omit them. Prograde and speed use planet-frame velocity.
Main-screen dashes fade from starting opacity now to ending opacity at 3,600 seconds ahead. Colour dimness changes brightness, not opacity.
Ignore crossings with less than this much predicted time between visits. Surface impacts still stop the preview.
Higher accuracy uses smaller integration steps and more worker time. 1× is the default; 0.25× is fastest and 4× is most accurate.
More points smooth long paths but add sampling and drawing work. This does not change integration accuracy.
Complete forecasts run in a background worker. The previous path stays visible until its replacement finishes. Update rate is a maximum, not a completion guarantee.
Time to move 99% toward a new contact-panel path and zoom. 0 is instant. Does not change the main orbit preview.
A turn against rotation this fast starts with heavy pulses
Main-engine exhaust pushes debris and asteroids in a 60° cone behind the ship. Strength is pressure at full throttle with a 10,000 N engine; higher engine force increases the push. The push fades with distance. Set either effect slider to zero to disable it.
How far the nose drifts from the held heading before the autopilot corrects it
CPU and GPU overlap; do not add their times.
Headroom measures main-thread slack only.
Planet-centred · +x right · +y up · metres
W thrust · A D rotate · Space fire · scroll to zoom Hold ▲ thrust · ↺ ↻ rotate · ◎ fire · pinch to zoom